The Eglin Reuse Project, also known as the Santa Rosa Reuse Project and the Eglin RIBs Project, is currently in Phase 1A. Land on Eglin Air Force Base is being cleared and prepared for the eventual arrival of a Holley Navarre Water System spray field.