“That pipe is corroded and obviously in danger of failing.”
Those were the words Holley-Navarre Water System CEO Jeff Crigler used when describing the condition of the primary influent force main at the system’s wastewater treatment plant, located on Pepper Drive in the Holley by the Sea neighborhood.