News

Bridge construction on track

| Brian Lester

As 2020 came to a close, a familiar sound began once more in Gulf Breeze near the battered Pensacola Bay Bridge.

The rhythmic pong, pong, pong signifies a new milestone in repairs. Pilings are once again being driven deep into the soft bay floor by a massive crane like structure, a hammer and nail type set up on a grand scale.

bridge

 

You must have a Website Subscription to continue reading.
Subscribe for as little as $3.17 a month.

 

 


  • 7502 Harvest Village Ct
    Navarre, FL 32566

  • Monday - Friday
    9:00 a.m. - 5:00 p.m.


© Copyright 2016-2026 Sandpaper Publishing, Inc. All Rights Reserved. Terms of Service

error: Content is protected !!