Please ensure Javascript is enabled for purposes of website accessibility
Skip to main content
Advertisement

News

East Bay Boulevard closed between Cedar Street and Melissa Oaks Drive March 22-23

| Staff Reporters
East Bay Boulevard from Cedar Street to Melissa Oaks Drive will be closed beginning at 7 a.m. on Saturday, March 22 until noon on Sunday, March 23. The roadway will be closed for the replacement of a culvert as part of the ongoing East Bay drainage project.

Motorists are asked to use caution in the area and follow detour instructions. Motorists in the area may utilize Cedar Street, north of the closure, to Abercrombie Road to access Hwy. 98 and may use the reverse if needing to access East Bay Boulevard past Melissa Oaks Drive.

A larger view of this map is available online at www.santarosa.fl.gov/ImageRepository/Document?documentID=8581.

error: Content is protected.