Discussions of Holley Navarre Water System’s (HNWS) largest multi-million infrastructure project got tense Aug. 20 as the board of directors argued over the process to reach a deal.
The board is inching forward with the creation of a memorandum of understanding (MOU) with Santa Rosa County to dispose of mounting wastewater effluent on a piece of Eglin Air Force Base property through the construction of a rapid infiltration basin system, better known as the Eglin RIBs project.
Read the full article in the Aug. 29 issue of Navarre Press.
Visit navarrepress.com/subscribe to view subscription options – or
click here sign up to receive a digital subscription to Navarre Press for 30 days free.
You must be logged in to post a comment Login