As sand slips away, county prepares for future beach restoration

From the moment that the last grain of sand was piped from the last dredge onto Navarre Beach during the 2016 renourishment project, the shore has been shrinking.

But County Engineer Roger Blaylock said there is no reason to worry. This is all just part of the process.

Read the full article in the Aug. 9 issue of Navarre Press. Click here to subscribe for as little as $38 per year!

Contact Us

Navarre Press

7502 Harvest Village Ct.
Navarre FL 32566

info@navarrepress.com
850-939-8040

Social Connections

Sign Up for Our Newsletter

Your Name

Your Email

Search in Site

You must be logged in to post a comment Login