Tale of two flood control delays

The familiar military axiom “Hurry up and wait” is now shared by the civilian residents of Holley by the Sea and the City of Gulf Breeze who yearn for flood control relief measures they say are long overdue.

Each of the similarly sized communities is run by governments that have separate studies in hand documenting necessary infrastructure projects estimated to cost a total of about $11 million.

Read the full article in the May 18 issue of Navarre Press. Subscribe online at navarrepress.com for as little as $38 per year.

 

Contact Us

Navarre Press

7502 Harvest Village Ct.
Navarre FL 32566

[email protected]
850-939-8040

Social Connections

Sign Up for Our Newsletter

Your Name

Your Email

captcha
Enter the code from above.

Search in Site

You must be logged in to post a comment Login