Sunrise Drive to close for flood-control work

Construction to reduce repeated flooding at the entrance of Sunrise Drive in Navarre will begin March 5 with the installation of traffic control measures.

This project, funded with roughly $530,000 in local option sales tax (LOST) dollars, is designed to help prevent flooding from the ponds located on each side of Sunrise Drive following extended or intense rainfall.

Read the full article in the Mar. 1 issue of Navarre Press. Visit www.navarrepress.com/subscribe to view subscription options.

Sign up to receive the online edition of Navarre Press for 30 days free! Go to http://navarrepress.fl.newsmemory.com/ then click on the drop down bar and select base rates.

Contact Us

Navarre Press

7502 Harvest Village Ct.
Navarre FL 32566

info@navarrepress.com
850-939-8040

Social Connections

Sign Up for Our Newsletter

Your Name

Your Email

Search in Site

You must be logged in to post a comment Login