Repair work to Highway 98 in Gulf Breeze

Florida Department of Transportation (FDOT)The Florida Department of Transportation (FDOT) reports an emergency repair project for the intersection of U.S. 98 and Shoreline Drive in Gulf Breeze will begin Tuesday, May 27.

The eastbound right lane of U.S 98 and Shoreline Drive between U.S 98 and Daniel Drive will be closed while repairs are made.

Crews will replace a pipe and repave the roadway. Work is anticipated to take about 25 days.


Share and Like

Social Connections

Navarre Press

You must be logged in to post a comment Login